A hybrid genetic algorithm for the job shop scheduling problem
JF Gonçalves, JJ de Magalhães Mendes, MGC Resende
European journal of operational research 167 (1), 77-95, 2005
8592005
A genetic algorithm for the resource constrained multi-project scheduling problem
JF Gonçalves, JJM Mendes, MGC Resende
European journal of operational research 189 (3), 1171-1190, 2008
5122008
A random key based genetic algorithm for the resource constrained project scheduling problem
JJM Mendes, JF Gonçalves, MGC Resende
Computers & Operations Research 36 (1), 92-109, 2009
3312009
A comparative study of crossover operators for genetic algorithms to solve the job shop scheduling problem
J Magalhaes-Mendes
WSEAS transactions on computers 12 (4), 164-173, 2013
1772013
A biased random-key genetic algorithm with forward-backward improvement for the resource constrained project scheduling problem
JF Gonçalves, MGC Resende, JJM Mendes
Journal of Heuristics 17 (5), 467-486, 2011
1262011
Evolutionary algorithms and metaheuristics: applications in engineering design and optimization
D Greiner, J Periaux, D Quagliarella, J Magalhaes-Mendes, B Galván
Mathematical Problems in Engineering 2018, 1-4, 2018
312018
Sistema de apoio à decisão para planeamento de sistemas de produção tipo projecto
J Magalhães Mendes
Faculdade de Engenharia da Universidade do Porto, 2003
27*2003
Project scheduling under multiple resources constraints using a genetic algorithm
J Magalhães-Mendes
WSEAS Transactions on Business and Economics 5 (11), 487-496, 2008
252008
A Two-level Genetic Algorithm for the Multi-Mode Resource-Constrained Project Scheduling Problem
J Magalhães-Mendes
International Journal of Systems Applications, Engineering & Development …, 2011
232011
Evolutionary Algorithms and Metaheuristics in Civil Engineering and Construction Management
J Magalhaes-Mendes, D Greiner
Computational Methods in Applied Sciences, Springer, 2015
202015
The Basic Multi-Project Scheduling Problem
JF Goncalves, J Magalhães-Mendes, MGC Mauricio
Handbook on Project Management and Scheduling - Chapter 31 2, 667-684, 2015
202015
EVOLUTIONARY ALGORITHMS AND METAHEURISTICS IN CIVIL ENGINEERING AND CONSTRUCTION MANAGEMENT
J MAGALHAES-MENDES, D GREINER
11th. World Congress on Computational Mechanics (WCCM2014), 2014
202014
Active, Parameterized Active, and Non-Delay Schedules for Project Scheduling with Multi-Modes
J MAGALHÃES-MENDES
Proceedings of the 16th WSEAS International Conference on APPLIED …, 2011
92011
Project scheduling using a competitive genetic algorithm
J Magalhães-Mendes
Proceedings of the 8th Conference on Simulation, Modelling and Optimization …, 2008
92008
Multiobjective Genetic Algorithm-Based for Time-Cost Optimization
J Magalhães-Mendes
The 2015 International Conference on Mathematical Methods, Mathematical …, 2015
82015
Multiobjective optimization: time-cost application in construction
J Magalhães-Mendes
Congresso de Métodos Numéricos em Engenharia, 2015
72015
A hybrid genetic algorithm for the multi-mode resource-constrained project scheduling
J Magalhaes-Mendes
6th European Congress on Computational Methods in Applied Sciences and …, 2012
72012
A genetic algorithm for the job shop scheduling with a new local search using Monte Carlo method
J Magalhães-Mendes
Proceedings of the 10th WSEAS international conference on Artificial …, 2011
72011
A genetic algorithm for the resource constrained multi-project scheduling problem [J]
JJM Mendes, MGC Resende
European Journal of Operational Research 189 (3), 1171-1190, 2008
62008
Project Scheduling with Multiple Modes: A Genetic Algorithm based Approach
JM Mendes
PROCEEDINGS OF THE FIRST INTERNATIONAL CONFERENCE ON SOFT COMPUTING …, 2009
5*2009