Follow
Alireza Eydi
Alireza Eydi
Professor of Industrial Engineering, Faculty of Engineering, University of Kurdistan, Sanandaj
Verified email at uok.ac.ir
Title
Cited by
Cited by
Year
Location-routing problem in multimodal transportation network with time windows and fuzzy demands: Presenting a two-part genetic algorithm
S Fazayeli, A Eydi, IN Kamalabadi
Computers & Industrial Engineering 119, 233-246, 2018
1452018
A model for distribution centers location-routing problem on a multimodal transportation network with a meta-heuristic solving approach
S Fazayeli, A Eydi, IN Kamalabadi
Journal of Industrial Engineering International 14, 327-342, 2018
322018
Bi-level programming model and KKT penalty function solution approach for reliable hub location problem
E Korani, A Eydi
Expert systems with applications 184, 115505, 2021
282021
Modeling of the capacitated single allocation hub location problem with a hierarchical approch
E Korani, AR Eydi
International Journal of Engineering 27 (4), 573-586, 2014
272014
Multi-modal urban transit network design considering reliability: multi-objective bi-level optimization
AH Barahimi, A Eydi, A Aghaie
Reliability Engineering & System Safety 216, 107922, 2021
242021
A Hybrid Method Based on Fuzzy AHP and VIKOR for the Discrete Time-Cost-Quality Trade-off Problem
FA A Eydi, H Farughi
Journal of Optimization in Industrial Engineering 9 (19), 105-116, 2016
23*2016
Developing and solving an integrated model for production routing in sustainable closed-loop supply chain
Y Emamian, IN Kamalabadi, A Eydi
Journal of Cleaner Production 302, 126997, 2021
202021
A sustainable closed loop supply chain design problem in intuitionistic fuzzy environment for dairy products
M Behzadianfar, A Eydi, M Shahrokhi
Soft Computing, 1-19, 2022
182022
Vehicle routing problem in reverse logistics with split demands of customers and fuel consumption optimization
A Eydi, H Alavi
Arabian Journal for Science and Engineering 44, 2641-2651, 2019
172019
A decision support system for single-period single sourcing problem in supply chain management
A Eydi, L Fazli
Soft Computing 23, 13215-13233, 2019
152019
A multi-product model for evaluating and selecting two layers of suppliers considering environmental factors
A Eydi, M Bakhtiari
RAIRO-Operations Research 51 (4), 875-902, 2017
102017
User-based vehicle route guidance in urban networks based on intelligent multi agents systems and the ant-q algorithm
A Eydi, S Panahi, I INakhai Kamalabadi
International Journal of Transportation Engineering 4 (3), 147-161, 2017
102017
Model and solution approach for multi objective-multi commodity capacitated arc routing problem with fuzzy demand
A Eydi, L Javazi
Journal of Industrial and Systems Engineering 5 (4), 208-229, 2012
102012
A DEA model with dual-role factors and fuzzy data for selecting third-party reverse logistics provider, case study: hospital waste collection
A Eydi, S Rastgar
AIN Shams Engineering Journal 13 (2), 101561, 2022
92022
A bi-objective vehicle routing problem with time windows and multiple demands
A Eydi, SA Ghasemi-Nezhad
Ain Shams Engineering Journal 12 (3), 2617-2630, 2021
92021
Modeling and Solution of Maximal Covering Problem Considering Gradual Coverage with Variable Radius over Multi-Periods
A Eydi, J Mohebi
RAIRO-Operations Research 52 (4), 1245-1260, 2018
92018
Evaluating and Selecting Two-Layers of Suppliers in Green Supply Chain using Hierarchical Fuzzy Topsis based on Alpha Levels
A Eydi, M Bakhtiari
Journal of Industrial Management Perspective 6 (2), 91-121, 2016
92016
Robust sustainable multi-period hub location considering uncertain time-dependent demand
A Khaleghi, A Eydi
RAIRO-Operations Research 55 (6), 3541-3574, 2021
72021
An integrated decision making model for supplier and carrier selection with emphasis on the environmental factors
A Eydi, A Fathi
Soft Computing 24 (6), 4243-4258, 2020
72020
A novel heuristic method to solve the capacitated arc routing problem
A Eydi, L Javazi
International Journal of Industrial Engineering Computations 3 (5), 767-776, 2012
72012
The system can't perform the operation now. Try again later.
Articles 1–20