Follow
Carlos Herrera
Title
Cited by
Cited by
Year
Wind farm layout optimization using a Gaussian-based wake model
L Parada, C Herrera, P Flores, V Parada
Renewable Energy, 2017
1682017
A reactive decision-making approach to reduce instability in a master production schedule
C Herrera, S Belmokhtar-Berraf, A Thomas, P Victor
International Journal of Production Research, 2015
472015
Assessing the energy benefit of using a wind turbine micro-siting model
L Parada, C Herrera, P Flores, V Parada
Renewable energy 118, 591-601, 2018
312018
Viable system model approach for holonic product driven manufacturing systems
C Herrera, SB Berraf, A Thomas
Service Orientation in Holonic and Multi-Agent Manufacturing Control, 169-181, 2012
212012
Cadre générique de planification logistique dans un contexte de décisions centralisées et distribuées
C Herrera
Université Henri Poincaré-Nancy 1, 2011
172011
A viable system model for product-driven systems
C Herrera, A Thomas, S Belmokhtar, R Pannequin
International Conference on Industrial Engineering and Systems Management …, 2011
172011
Evolution of new algorithms for the binary knapsack problem
L Parada, C Herrera, S Mauricio, V Parada
Natural Computing, 2015
152015
Architecture de systèmes contrôlés par la produit pour un environnement de juste à temps
A Thomas, H El Haouzi, T Klein, S Belmokhtar, C Herrera
Journal Européen des Systèmes Automatisés (JESA) 43 (4-5), 513-535, 2009
152009
Simulation of less master production schedule nervousness model
C Herrera, A Thomas
IFAC Proceedings Volumes 42 (4), 1585-1590, 2009
142009
A product-driven system approach for multilevel decisions in manufacturing planning and control
C Herrera, A Thomas, V Parada
Production & Manufacturing Research: An Open Access Journal 2 (1), 756–766, 2014
122014
Proposition d'un cadrage générique de modélisation et de simulation de planifications logistiques dans un contexte de décisions partiellement distribuées
C Herrera
PhD thesis, Nancy Université, 2011
62011
Automatic generation of algorithms for the binary knapsack problem
L Parada, M Sepúlveda, C Herrera, V Parada
2013 IEEE Congress on Evolutionary Computation, 3148-3152, 2013
52013
A general approach for hierarchical production planning considering stability
S Belmokhtar, C Herrera, A Thomas
3rd International Conference on Information Systems, Logistics and Supply …, 2010
52010
Un modèle pour limiter la nervosité et l'instabilité du Programme Directeur de Production
C Herrera, A Thomas
8ème Congrès International de Génie Industriel, 2009
42009
Complexity indices for the multidimensional knapsack problem
I Derpich, C Herrera, F Sepúlveda, H Ubilla
Central European Journal of Operations Research 29, 589-609, 2021
32021
A Case-based Reasoning Approach to Find Good Compiler Optimization Sequences
ED de Lima, AF da Silva, C Herrera
32013
Formulation for less master production schedule instability under rolling horizon
C Herrera, A Thomas
International Conference on Industrial Engineering and Systems Management …, 2009
32009
Proposición de un método basado en cadenas de Markov para el pronóstico de fibrilaciones auriculares paroxísticas
P Sáez, C Herrera
Ingeniare. Revista chilena de ingeniería 23 (3), 449-457, 2015
22015
Polyhedron Flatness as an explanatory variable for Branch and Bound algorithm computational effort
I Derpich, C Herrera
Optimization Online, 2013
22013
A product-driven system approach to generate fast solutions to the job shop scheduling problem.
P Sáez, C Herrera, JE Pezoa
IFAC-PapersOnLine 55 (10), 1930-1937, 2022
12022
The system can't perform the operation now. Try again later.
Articles 1–20